厂家告诉你抹面砂浆怎么用
来源://www.gochiism.com 日期:2022-09-01 发布人:
在水泥或着是石灰砂浆中掺加进适当的掺合料,比如粉煤灰、硅藻土等等,以节约水泥或者是石灰用量,同时,改善一下砂浆的和易性。下面小编为大家介绍一下济南抹面砂浆怎样使用。
Appropriate admixtures such as fly ash and diatomite are added to the cement or lime mortar to save the cement or lime consumption and improve the workability of the mortar. The following editor will introduce how to use Jinan plastering mortar.
1、抹面砂浆基层处理将板底或混凝土、砌块等抹灰面上的杂物清理干净,对于钢筋混凝土,应将混凝土上的突出物剔除,并将模板接缝处残余的海绵条或胶带纸等清理干净。将基底上浮尘扫除,提前用水喷淋,使之湿润。同时应对施工部位的楼地面进行清扫,以利于抹灰后清理抹灰时产生的落地保温砂浆。
1. Plastering mortar base course treatment: clean the sundries on the bottom of the slab or the plastering surface of concrete and blocks. For reinforced concrete, remove the protrusions on the concrete, and clean the residual sponge strips or adhesive tapes at the formwork joints. Remove the floating dust on the base and spray it with water in advance to make it wet. At the same time, the floor of the construction site shall be cleaned to facilitate the cleaning of the floor insulation mortar generated during plastering after plastering.
2、涂大旗界面剂或用拉毛在涂抹处理干净的基层上满涂界面剂或用拉毛,沿钢筋混凝土与加气混凝土接缝处抹3-4mm厚抹面砂浆,随即压入400宽耐碱网格布每边200宽,表面在用抹面砂浆抹平。然后满涂界剂或用拉毛。
2. Apply the big flag interface agent or roughen the surface of the cleaned base layer with the interface agent or roughen it. Apply 3-4mm thick plastering mortar along the joint between the reinforced concrete and the aerated concrete. Then press the 400 wide alkali resistant mesh cloth with a width of 200 on each side. The surface is plastered with the plastering mortar. Then apply the coating agent or roughen it.
3、抹面砂浆贴饼厚度控制点采用保温砂浆设置,大小为20*20,厚度为所需保温层厚度,保温层厚度控制点间距宜为1.5m以内。
3. The thickness control point of plastering mortar paste is set with thermal insulation mortar, with the size of 20 * 20 and the thickness of the required thermal insulation layer. The distance between the control points of thermal insulation layer thickness should be within 1.5m.
4、保温砂浆分层涂抹
4. Thermal insulation mortar layer by layer
(1)拌料:用人工按保温砂浆:水=1:1(重)搅拌均匀成膏状,根据气候温度可自行掌握和易性,随拌随用。
(1) Mixing materials: manually mix the thermal insulation mortar: water = 1:1 (weight) to form a paste. According to the climate and temperature, the workability can be controlled by yourself, and the mixture can be used at any time.
(2)涂抹层保温砂浆。要求厚度不得高过1.5cm,压实,表面留毛面。
(2) Apply thermal insulation mortar. It is required that the thickness shall not be more than 1.5cm, and it shall be compacted with rough surface left on the surface.
(3)二层形成初凝后(加钢丝网),涂抹第三层,厚度不高过2cm。注意:下一层涂抹一般间隔24,分层之间留毛面。
(3) After the initial setting of the second layer is formed (steel wire mesh is added), the third layer shall be coated with a thickness of no more than 2cm. Note: the next layer is generally applied at an interval of 24, leaving a rough surface between layers.
(4)抹面砂浆分层涂抹时,应适度按压,以确保层与层之间能形成有.效粘结,但不可在同一部位来回抹压。在涂抹中,发现有鼓包产生,应及时剔除补抹。抹面砂浆
(4) When the plastering mortar is applied in layers, it shall be pressed moderately to ensure that there is a gap between layers Effective bonding, but cannot be plastered and pressed back and forth at the same position. In case of any bulge during coating, it shall be removed and repaired in time. Plastering mortar
5、铺设耐碱玻纤网布
5. Laying alkali resistant glass fiber mesh
保温砂浆表面收光时,把耐碱玻纤网布用抹子直接压在材料表面,同时收光,严禁漏铺。耐碱玻纤网布铺设时要求平整、无皱褶,顺序搭接,搭接宽度30-50mm;外檐铺设时搭接宽度80-100mm;阳角与保温接茬处压贴100mm宽的耐碱玻纤网布。
When the surface of thermal insulation mortar is polished, the alkali resistant glass fiber mesh cloth shall be directly pressed on the material surface with a trowel, and the surface shall be polished at the same time. It is strictly prohibited to omit laying. The alkali resistant glass fiber mesh cloth shall be laid flat and without wrinkles, and shall be overlapped in sequence, with the overlapping width of 30-50mm; When laying the outer eaves, the overlapping width is 80-100mm; 100mm wide alkali resistant glass fiber mesh cloth shall be pressed and pasted at the external corner and insulation joint.
注意:当施工期间,气温超过30℃的时候,要在拌完成之后的3小时里面使用完毕。为了方便配料,也为了减少施工中的切锯工作量,在建筑施工中,要进行排块的设计。更多相关事项就来我们网站//www.gochiism.com咨询了解吧!
Note: when the temperature exceeds 30 ℃ during construction, it shall be used within 3 hours after mixing. In order to facilitate batching and reduce the workload of cutting and sawing during construction, the design of block arrangement shall be carried out during construction. For more information, please visit our website //www.gochiism.com Consult and understand!