欢迎您浏览济南巨野河福华建材厂,主营:济南腻子粉,济南石膏粉,济南抹面砂浆等建筑装饰材料,大量批发,欢迎咨询。

专注绿色建筑装饰材料

经营管理理念:让客户用的放心!

24小时服务热线:

13864111871

当前位置: 首页 - 济南福华建材厂下载地址 > 行业资讯
行业资讯
联系我们

济南福华建材厂

联系人:吴老师 

电话:13864111871 

手机:13864111871
          0531-81901300
地址:山东省济南市高新开发区巨野河办事处山圈村西


济南抹面砂浆的施工方法!

来源://www.gochiism.com 日期:2019-01-31 发布人:

  保温砂浆的施工方法,小编进行一个简单的介绍:

The construction method of thermal insulation mortar is briefly introduced in this paper.
1、保护层施工完毕后,养护2-3天(视气温而异)即可进行后序饰面层施工。
1. After the completion of the construction of the protective layer, the construction of the post-sequence decorative layer can be carried out after 2-3 days of maintenance (depending on the temperature).
2、热天或基层干燥即可基层吸水量大时应用水湿润,使基层达到内湿外干,表面无明水。
2. Hot days or base drying can be used to wet the base when the water absorption is large, so that the base can reach internal and external drying, and there is no clear water on the surface.
陕西保温砂浆
Shaanxi thermal insulation mortar
3、基层表面应无粉尘和无油污及影响粘结性能的杂物。
3. There should be no dust and oil pollution on the surface of the base and impurities affecting the bonding performance.
4、将保温系统专用界面剂按照水灰比1:4搅拌均匀,批刮于基层上,并拉成锯齿状,厚度约为3mm,或用喷涂方法也可。
4. The special interface agent for thermal insulation system is stirred evenly according to the water cement ratio of 1:4, scraped batch on the base, and pulled into serrated shape. The thickness is about 3mm, or spraying method can be used.
5、将无机保温砂浆按照水灰比1:1搅拌成浆体,应搅拌均匀,无粉团。
5. Mixing inorganic thermal insulation mortar into slurry according to the ratio of water to cement 1:1, it should be stirred evenly and without powder.
济南抹面砂浆
6、后在抗碱网格布上再次涂抹2~3 MM厚度的抗裂砂浆。
6. Finally, the anti-cracking mortar with thickness of 2-3 MM is smeared on the anti-alkali mesh cloth.
陕西保温砂浆厂家
Shaanxi thermal insulation mortar manufacturer
7、将抗裂砂浆涂抹于保温砂浆上,厚度为2MM。
7. Apply anti-cracking mortar on insulation mortar with thickness of 2MM.
8、在抗裂砂浆表面挂上抗碱网格布。
8. Alkali-resistant mesh cloth is hung on the surface of crack-resistant mortar.
9、将保温砂浆根据节能要求进行粉抹,2cm以上需分次施工,2遍抹灰间隔应在24小时以上,用喷涂方法也可以。
9. The insulation mortar should be whitewashed according to the requirement of energy saving. It needs to be constructed in stages above 2cm. The interval between two times of plastering should be more than 24 hours. Spraying method can also be used.


Baidu
map